Northwestern Schools New K-6 & 7-12

Project Details

Construction Start Date:
June 2011
Completion Date:
May 2013
Construction Cost:
$51,345,655 Budget
Construction Type:
Construction Management

Project Contacts

Owner:

Northwestern Local Schools
5610 Troy Road Project, Springfield, OH 45502
Tel: 937-964-1318, Contact: Tony Orr, Supt.

Architect:

SHP Leading Design
4805 Montgomery Rd. #400, Cincinnati, OH 45212
Tel: 513-381-2112, Contact: Kevin Kruez

Construction Manager:

Shook Touchstone
Tel: 937.531.4341, Project Mgr.: Matt Heulsman
Superintendent: Gary Jesse

Project Scope

Construction a new PK-6 (900 students/110,000 SF) and 7-12 school facilities (835 students/137,000 SF), totaling 247,000 square feet. The PK-6 building includes a main event gym and auxiliary gym for multi-use purposes and extra practice facilities. The design is a 2-story building with classroom wings and wide, brightly lit corridors, up-to-date security features and technology, and plenty of day-light. The new 7-12 junior/senior high building will also be a 2-story design with a separate wing for both the middle and high schools. Both facilities will have abundant natural lighting to reduce heating costs, dining space, media, art and music rooms and office spaces. Each building will target a minimum of LEED Silver certification through the USGBC. The buildings will be constructed on the existing school campus and will require large scale campus rework and the demolition of the three existing schools. The project will include a geo-thermal HVAC system and technology systems of the highest quality. The district is very community-focused and the facilities will be designed and constructed in a manner which will accommodate community gathering spaces.

  • Default
  • Title
  • Date

Contact Us

880 Shawnee Road
Lima, Ohio 45805

Phone: (419) 228-7272
Fax: (419) 222-5559