SRMC Medical Office Building 3

Project Details

Construction Start Date:
July 1998
Completion Date:
September 1999
Construction Cost:
$6,274,100
Construction Type:
Construction Management

Project Contacts

Owner:

St. Rita's Medical Center
730 W. Market Street, Lima, Ohio 45805
Tel: 419-226-9106, Contact: Ron Connovich

Architect:

Zimmerman Design Group
7707 Harwood Avenue, Milwaukee, Wisonsin 53213
Tel: 414-476-9500

Construction Manager:

Touchstone CPM
Tel: 419-228-7272
Project Manager: Nate Neuenschwander

Project Scope

The St. Rita's Medical Office Building #3 facility is a beautifully designed 4-level structure, constructed of structural steel. The foundation is made of concrete spread footings, which required extensive site development. The floors are concrete over metal decking. The roof is made of steel joists and metal decking. The building envelope bears an EIFS (Exterior Insulation Finishing System) and curtain wall exterior. The entire facility consists of approximately 100,000 square feet which also includes a connecting walkway to an existing adjacent medical building and another to the parking garage. This project also included the process of leasing out tenant spaces and working closely with doctors. This project was built and designed in two phases. First, the shell was constructed, then the interior work followed. This project was constructed simultaneously with the adjacent parking garage facility as well as both sky-walk structures. As a whole, this project required extensive coordination among all trades and project stakeholders.

  • Default
  • Title
  • Date

Contact Us

880 Shawnee Road
Lima, Ohio 45805

Phone: (419) 228-7272
Fax: (419) 222-5559