New First Dayton Cancer Center

Project Details

Construction Start Date:
November 2002
Completion Date:
July 2003
Construction Cost:
$1,222,683
Construction Type:
Construction Management

Project Contacts

Owner:

First Dayton Cancer Center
2032 Woodman Ctr. Ct., Kettering, OH 45420
Tel: 937-293-2273, Contact: Dr. Ed Hughes

Architect:

Architection
7707 Harwood Ave., Milwaukee, WI 53213
Tel: 414-476-9500, Contact: Paul Torp

Construction Manager:

Touchstone CPM
Tel: 419-228-7272, PM: Jake Miller, Supt.: Phil Stechschulte

Project Scope

The project scope consisted of a newly constructed 8,000 square foot oncology center. This facility features a wood frame with concrete floor slab and cast-in-place concrete accelerator and HDR vaults. The building includes a metal panel roof, brick veneer, wood windows, power-operated doors and a beautiful interior finish package. The building is programmed to include an accelerator vault, simulator room, mold room, physician's practice, office space, and a spacious waiting and reception area. The accelerator vault is constructed of thick concrete walls and ceilings ranging up to seven feet in thickness. Lead doors, shielding, and protective glass are also components of this facility.